Past Projects » Isla Vista Storm Drain & Alley Improvement Project

The Isla Vista Storm Drain Improvement Project was a cooperative project between the Flood Control District and the Transportation Division of the Public Works Department. The project was located in Isla Vista from Pasado Road to Del Playa Drive and terminated at the south end of the Escondido Pass Road right-of-way (between Camino Corto and Camino Del Sur). The project plans consisted of two parts, one was for the installation of approximately 1,000 linear feet of new storm drain pipe and new catch basins designed by the Flood Control District, and the other was for alley vehicular and pedestrian improvements designed by the Transportation Division.